{"id":37666,"date":"2024-03-26T19:26:46","date_gmt":"2024-03-26T18:26:46","guid":{"rendered":"https:\/\/bodenbusinesspark.com\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/"},"modified":"2024-05-02T15:29:12","modified_gmt":"2024-05-02T13:29:12","slug":"de-ska-bygga-nordens-storsta-batteripark-i-boden","status":"publish","type":"post","link":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/","title":{"rendered":"They will build the largest battery park in the Nordic region in Boden"},"content":{"rendered":"\n<p class=\"has-medium-font-size\">The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.<\/p>\n\n\n\n<p><a href=\"https:\/\/bodenxt.se\/en\/next-phase-launched-at-boden-industrial-park\/\" target=\"_blank\" rel=\"noreferrer noopener\" class=\"ek-link\"><span style=\"text-decoration: underline;\" class=\"ek-underline\">Boden Industrial Park<\/span>\u00a0<\/a>has become synonymous with H2 Green Steel\u2019s pioneering establishment. However, more than half of the area of Sweden\u2019s largest detailed planned industrial area (550 hectares) has not yet been developed.<\/p>\n\n\n\n<p>Now, another major project is running, aiming to accelerate the green transition. This time, it involves strengthening the local power grid by establishing the largest battery park in the Nordic region on an area of one hectare with a capacity of 50 megawatts (MW) and 100 megawatt hours (MWh).<\/p>\n\n\n\n<p>The 50 MW capacity refers to the maximum power that can be generated at a given time and could theoretically supply a small city with energy. The total amount of energy that can be generated and used over a specific period is 100MWh. This corresponds to the energy consumption of approximately 1,800 Swedish houses per day.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"font-size:19px;font-style:normal;font-weight:800\">Enabling more renewable energy<\/h3>\n\n\n\n<div style=\"height:8px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The initiative directly addresses the need to increase the energy system\u2019s flexibility and reliability as renewable energy production grows. This means that Boden\u2019s local energy system becomes more resilient while being better at handling peak loads from the industry.<\/p>\n\n\n\n<p>The battery park functions as a storage facility that can store energy when supply exceeds demand and quickly release energy during periods when demand increases, especially at times when solar or wind energy is not available. This contributes to reducing dependence on fossil fuels and the amount of imported electricity, a critical component in the global fight against climate change. Battery storage can also help maintain voltage quality in the power grid by offering reactive power, which is important to keep the voltage within desired limits across the network.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"font-size:19px;font-style:normal;font-weight:800\">Energy sustainability<\/h3>\n\n\n\n<div style=\"height:8px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p><a href=\"https:\/\/bodensenergi.se\/\" target=\"_blank\" rel=\"noreferrer noopener\" class=\"ek-link\"><span style=\"text-decoration: underline;\" class=\"ek-underline\">Bodens Energi<\/span>\u00a0<\/a>is playing a key role in enabling the initiative, a collaboration between\u00a0<a href=\"https:\/\/www.vattenfall.se\/elavtal\/?gad_source=1&amp;gclid=Cj0KCQjwwYSwBhDcARIsAOyL0fhEepsHphtM1DbWRr_FsRbSZ-qxp5u4zdNBzuNIeCHXGkbCgNIN0V4aAkjjEALw_wcB&amp;gclsrc=aw.ds\" target=\"_blank\" rel=\"noreferrer noopener\" class=\"ek-link\"><span style=\"text-decoration: underline;\" class=\"ek-underline\">Vattenfall<\/span><\/a>\u00a0(owner of the regional grid), Bodens Energi (local grid owner) and\u00a0<a href=\"https:\/\/polarcapacity.se\/\" target=\"_blank\" rel=\"noreferrer noopener\" class=\"ek-link\"><span style=\"text-decoration: underline;\" class=\"ek-underline\">Polar Structure<\/span>\u00a0<\/a>(owner of the equipment).<\/p>\n\n\n\n<p>\u2013 The region we operate in is the hub of the green industrial transition and electrification in Sweden. This requires innovative thinking and courage regarding creating an energy system that can enable the planned investments. We need to accelerate the expansion of our power grids, while we need to build more renewable electricity production and energy storage. The investment we are now making together with Polar Structure is an excellent example of the latter,\u201d says Hans St\u00e5lnacke, CEO of Bodens Energi.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/hans-stalnacke-1024x683.webp\" alt=\"hans stalnacke\" class=\"wp-image-37282\" srcset=\"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/hans-stalnacke-1024x683.webp 1024w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/hans-stalnacke-300x200.webp 300w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/hans-stalnacke-768x512.webp 768w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/hans-stalnacke-1536x1025.webp 1536w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/hans-stalnacke.webp 2048w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Hans St\u00e5lnacke, CEO Bodens Energi. Photo: Mats Engfors \/ Fotographic<\/em><\/figcaption><\/figure>\n\n\n\n<p>The initiative aligns with Boden Energi\u2019s sustainability work, focusing on creating long-term solutions that respect ecological, social, and economic perspectives. Promoting energy recovery is an example of how the energy company can contribute to a more sustainable future.<\/p>\n\n\n\n<p>\u2013 As an energy company, we must be a driving force in the fantastic transition and we are incredibly proud to be able to contribute to one of the Nordic region\u2019s largest battery storage facilities here in Boden,\u201d says Hans St\u00e5lnacke.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" style=\"font-size:19px;font-style:normal;font-weight:800\">A sub-stage<\/h3>\n\n\n\n<div style=\"height:8px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>Polar Structure is somewhat of a Swedish pioneer in infrastructure solutions and already has one of the country\u2019s largest battery parks in place in Haninge, south of Stockholm. Although this investment now means building the largest battery park in the Nordic region for the time being, they see this as a stage in a larger project.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"810\" src=\"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/tobias-emanuelsson_liggande-1024x810.webp\" alt=\"tobias emanuelsson liggande\" class=\"wp-image-37288\" srcset=\"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/tobias-emanuelsson_liggande-1024x810.webp 1024w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/tobias-emanuelsson_liggande-300x237.webp 300w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/tobias-emanuelsson_liggande-768x608.webp 768w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/tobias-emanuelsson_liggande-1536x1215.webp 1536w, https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/tobias-emanuelsson_liggande.webp 1921w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\"><em>Tobias Emanuelsson, CEO of Polar Structure. Photo: Polar Structure<\/em><\/figcaption><\/figure>\n\n\n\n<p>\u2013 Battery storage is an important piece of the puzzle in the green transition and we are very happy to enable this groundbreaking battery storage project together with Bodens Energi, says Tobias Emanuelsson and continues:<\/p>\n\n\n\n<p>\u2013 The municipality of Boden has a holistic approach to community development and infrastructure, and we are proud to contribute, not only with the railway but also with energy solutions. Strengthening the local energy system is an important key, both for the green transition and for a more resilient and sustainable society,\u201d says Tobias Emanuelsson, CEO, Polar Structure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.<\/p>\n","protected":false},"author":2,"featured_media":37285,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_tec_requires_first_save":true,"_editorskit_title_hidden":false,"_editorskit_reading_time":0,"_editorskit_is_block_options_detached":false,"_editorskit_block_options_position":"{}","_price":"","_stock":"","_tribe_ticket_header":"","_tribe_default_ticket_provider":"","_tribe_ticket_capacity":"0","_ticket_start_date":"","_ticket_end_date":"","_tribe_ticket_show_description":"","_tribe_ticket_show_not_going":false,"_tribe_ticket_use_global_stock":"","_tribe_ticket_global_stock_level":"","_global_stock_mode":"","_global_stock_cap":"","_tribe_rsvp_for_event":"","_tribe_ticket_going_count":"","_tribe_ticket_not_going_count":"","_tribe_tickets_list":"[]","_tribe_ticket_has_attendee_info_fields":false,"_EventAllDay":false,"_EventTimezone":"","_EventStartDate":"","_EventEndDate":"","_EventStartDateUTC":"","_EventEndDateUTC":"","_EventShowMap":false,"_EventShowMapLink":false,"_EventURL":"","_EventCost":"","_EventCostDescription":"","_EventCurrencySymbol":"","_EventCurrencyCode":"","_EventCurrencyPosition":"","_EventDateTimeSeparator":"","_EventTimeRangeSeparator":"","_EventOrganizerID":[],"_EventVenueID":[0],"_OrganizerEmail":"","_OrganizerPhone":"","_OrganizerWebsite":"","_VenueAddress":"","_VenueCity":"","_VenueCountry":"","_VenueProvince":"","_VenueState":"","_VenueZip":"","_VenuePhone":"","_VenueURL":"","_VenueStateProvince":"","_VenueLat":"","_VenueLng":"","_VenueShowMap":false,"_VenueShowMapLink":false,"_tribe_blocks_recurrence_rules":"","_tribe_blocks_recurrence_description":"","_tribe_blocks_recurrence_exclusions":"","_ecp_custom_2":"","footnotes":"","_tec_slr_enabled":"","_tec_slr_layout":""},"categories":[62,69,61],"tags":[],"class_list":["post-37666","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-business","category-developing-businesses","category-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>They will build the largest battery park in the Nordic region in Boden - Boden Business Park<\/title>\n<meta name=\"description\" content=\"The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"They will build the largest battery park in the Nordic region in Boden\" \/>\n<meta property=\"og:description\" content=\"The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/\" \/>\n<meta property=\"og:site_name\" content=\"Boden Business Park\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/bodenbusinesspark\" \/>\n<meta property=\"article:published_time\" content=\"2024-03-26T18:26:46+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-02T13:29:12+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/BESS-batteribild-utan-logo-scaled-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1440\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Linda Hammarstr\u00f6m\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Linda Hammarstr\u00f6m\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/\"},\"author\":{\"name\":\"Linda Hammarstr\u00f6m\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#\\\/schema\\\/person\\\/099567cb640f5a97fe0911d978226f26\"},\"headline\":\"They will build the largest battery park in the Nordic region in Boden\",\"datePublished\":\"2024-03-26T18:26:46+00:00\",\"dateModified\":\"2024-05-02T13:29:12+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/\"},\"wordCount\":681,\"publisher\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bodenbusinesspark.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/BESS-batteribild-utan-logo-scaled-1.jpg\",\"articleSection\":[\"Business\",\"Developing businesses\",\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/\",\"url\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/\",\"name\":\"They will build the largest battery park in the Nordic region in Boden - Boden Business Park\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/bodenbusinesspark.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/BESS-batteribild-utan-logo-scaled-1.jpg\",\"datePublished\":\"2024-03-26T18:26:46+00:00\",\"dateModified\":\"2024-05-02T13:29:12+00:00\",\"description\":\"The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/en\\\/de-ska-bygga-nordens-storsta-batteripark-i-boden\\\/#primaryimage\",\"url\":\"https:\\\/\\\/bodenbusinesspark.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/BESS-batteribild-utan-logo-scaled-1.jpg\",\"contentUrl\":\"https:\\\/\\\/bodenbusinesspark.com\\\/wp-content\\\/uploads\\\/2024\\\/03\\\/BESS-batteribild-utan-logo-scaled-1.jpg\",\"width\":2560,\"height\":1440},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#website\",\"url\":\"https:\\\/\\\/bodenbusinesspark.com\\\/\",\"name\":\"Boden Business Park\",\"description\":\"Vi \u00e4r m\u00f6jligg\u00f6rare\",\"publisher\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/bodenbusinesspark.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#organization\",\"name\":\"Boden Business Park\",\"url\":\"https:\\\/\\\/bodenbusinesspark.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/bodenbusinesspark.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/bbp.png\",\"contentUrl\":\"https:\\\/\\\/bodenbusinesspark.com\\\/wp-content\\\/uploads\\\/2022\\\/10\\\/bbp.png\",\"width\":354,\"height\":136,\"caption\":\"Boden Business Park\"},\"image\":{\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/bodenbusinesspark\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/boden-business-park\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/bodenbusinesspark.com\\\/#\\\/schema\\\/person\\\/099567cb640f5a97fe0911d978226f26\",\"name\":\"Linda Hammarstr\u00f6m\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/31d465eac9b9e6027cf114958ec99b2f5298e2ce7d026de4dbddf59b76c1e4bc?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/31d465eac9b9e6027cf114958ec99b2f5298e2ce7d026de4dbddf59b76c1e4bc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/31d465eac9b9e6027cf114958ec99b2f5298e2ce7d026de4dbddf59b76c1e4bc?s=96&d=mm&r=g\",\"caption\":\"Linda Hammarstr\u00f6m\"},\"description\":\"Kommunikat\u00f6r\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"They will build the largest battery park in the Nordic region in Boden - Boden Business Park","description":"The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/","og_locale":"en_US","og_type":"article","og_title":"They will build the largest battery park in the Nordic region in Boden","og_description":"The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.","og_url":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/","og_site_name":"Boden Business Park","article_publisher":"https:\/\/www.facebook.com\/bodenbusinesspark","article_published_time":"2024-03-26T18:26:46+00:00","article_modified_time":"2024-05-02T13:29:12+00:00","og_image":[{"width":2560,"height":1440,"url":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/BESS-batteribild-utan-logo-scaled-1.jpg","type":"image\/jpeg"}],"author":"Linda Hammarstr\u00f6m","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Linda Hammarstr\u00f6m","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/#article","isPartOf":{"@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/"},"author":{"name":"Linda Hammarstr\u00f6m","@id":"https:\/\/bodenbusinesspark.com\/#\/schema\/person\/099567cb640f5a97fe0911d978226f26"},"headline":"They will build the largest battery park in the Nordic region in Boden","datePublished":"2024-03-26T18:26:46+00:00","dateModified":"2024-05-02T13:29:12+00:00","mainEntityOfPage":{"@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/"},"wordCount":681,"publisher":{"@id":"https:\/\/bodenbusinesspark.com\/#organization"},"image":{"@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/#primaryimage"},"thumbnailUrl":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/BESS-batteribild-utan-logo-scaled-1.jpg","articleSection":["Business","Developing businesses","News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/","url":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/","name":"They will build the largest battery park in the Nordic region in Boden - Boden Business Park","isPartOf":{"@id":"https:\/\/bodenbusinesspark.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/#primaryimage"},"image":{"@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/#primaryimage"},"thumbnailUrl":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/BESS-batteribild-utan-logo-scaled-1.jpg","datePublished":"2024-03-26T18:26:46+00:00","dateModified":"2024-05-02T13:29:12+00:00","description":"The battery park will be adjacent to H2 Green Steel and is expected to be completed in 2024. It is seen as an important piece of the puzzle in the entire country\u2019s energy transition.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bodenbusinesspark.com\/en\/de-ska-bygga-nordens-storsta-batteripark-i-boden\/#primaryimage","url":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/BESS-batteribild-utan-logo-scaled-1.jpg","contentUrl":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2024\/03\/BESS-batteribild-utan-logo-scaled-1.jpg","width":2560,"height":1440},{"@type":"WebSite","@id":"https:\/\/bodenbusinesspark.com\/#website","url":"https:\/\/bodenbusinesspark.com\/","name":"Boden Business Park","description":"Vi \u00e4r m\u00f6jligg\u00f6rare","publisher":{"@id":"https:\/\/bodenbusinesspark.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bodenbusinesspark.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/bodenbusinesspark.com\/#organization","name":"Boden Business Park","url":"https:\/\/bodenbusinesspark.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bodenbusinesspark.com\/#\/schema\/logo\/image\/","url":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2022\/10\/bbp.png","contentUrl":"https:\/\/bodenbusinesspark.com\/wp-content\/uploads\/2022\/10\/bbp.png","width":354,"height":136,"caption":"Boden Business Park"},"image":{"@id":"https:\/\/bodenbusinesspark.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/bodenbusinesspark","https:\/\/www.linkedin.com\/company\/boden-business-park\/"]},{"@type":"Person","@id":"https:\/\/bodenbusinesspark.com\/#\/schema\/person\/099567cb640f5a97fe0911d978226f26","name":"Linda Hammarstr\u00f6m","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/31d465eac9b9e6027cf114958ec99b2f5298e2ce7d026de4dbddf59b76c1e4bc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/31d465eac9b9e6027cf114958ec99b2f5298e2ce7d026de4dbddf59b76c1e4bc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/31d465eac9b9e6027cf114958ec99b2f5298e2ce7d026de4dbddf59b76c1e4bc?s=96&d=mm&r=g","caption":"Linda Hammarstr\u00f6m"},"description":"Kommunikat\u00f6r"}]}},"ticketed":false,"_links":{"self":[{"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/posts\/37666","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/comments?post=37666"}],"version-history":[{"count":4,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/posts\/37666\/revisions"}],"predecessor-version":[{"id":37672,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/posts\/37666\/revisions\/37672"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/media\/37285"}],"wp:attachment":[{"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/media?parent=37666"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/categories?post=37666"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bodenbusinesspark.com\/en\/wp-json\/wp\/v2\/tags?post=37666"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}